Permit Process for Home Additions in Winnebago County

Nothing wastes more money on a home addition than skipping the permit and getting caught. Here's what actually has to happen in Winnebago County.

Zoning first. Setbacks and lot coverage decide whether your addition can go where you want it. We check zoning before drawing anything.

Building permit. Requires stamped architectural and engineering drawings. Typical review takes 2–4 weeks in Winnebago County, longer in the summer.

Inspections. Foundation, framing, rough plumbing, rough electrical, insulation, and final. We schedule them all.

Occupancy. Final inspection sign-off is what makes the addition legally habitable.

MGK pulls every permit for every addition we build — you never touch City Hall.